Hi... My Dear Friends...................!
Today Special "How to Get Building permit"
Building permit is an important document to start
the construction work or any other structure in your land. You must get
building permit from secretary of municipality if you are looking to construct
a house in your land. As per municipality rules every person who wants to
develop or build any structure should apply in writing to secretary in the form
Appendix A of building rules. It will take 30 days to getapproval. The
Secretary will notify you in writing if any additional document he required
within 30 days after your request. The documents that should submit to get
permit are as follow. All these Documents should be signed by you and
engineer/Architect before submission.
1. Filled application form (Appendix A)
2. Site plan shall be drawn to a scale of 1:400
and shall be fully dimensioned. Site plan should contain following things
All boundaries of the plot and the any
neighboring street in relative to the position of the site
Access to the site and the name of the same. Also
mark width of the access.
All structures exist in the plot
All street path and footpath exist in the site.
Mention the subdivion if the plot is subdivided
to any division
The area of undevelopable such as rocky outcrops,
steep terains, marshes etc.
The area and the land which is not proposed to
develop with in the plot.
The area of any paddy field
The north direction and wind direction
Topographic contour
The site plan shall include a key plan drawn to a
scale of 1:4000that gives all details of the site, adjacent landmarks within a
distance of 30 KM of the plot.
3. Service plan in scale 1:400
Existing watersuply plan
Existing electricity plan
Existing drainage and sewage plan
Proposed water supply plan
Proposed electricity plan
Proposed drainage and sewage layout
All the drawing should be prepared in A3 paper
(24*33) cm and signed by a registered engineer
4.Building Plan Building plan is an another
important document to submit to get residential permit. It should contain street
elevation building section of the home that you are going to build. All these
drawings shall drawn to a scale 1:100.
All floor plans, staircase, water closet bath,
sink etc.
All street elevations
Section of the building from foundation to roof
Location and direction of water tank , fire
fighting and all small structures.
5.A Certificate:Attach a certificate from the
designer to effect that the work shall be carried out in the supervision of him
6.Fees depending on the area and type of building
you are going to construct.
Approval of site plan and issue of permit
After inspection, the secretary shall approve the
site and site plan. After approving the site plan he will study the building
plan elevation and section of the building and specification of the work and
approve the plan and issue permit to execute the work. Approval of the plan and
building permit shall be intimated to the applicant in writing.
Time frame to approve the permit by secretary
The maximum time took by secretary to approve the
site plan and building permit is 30 days. If not the applicant can make a request
to council and they will approve wihin 30 days. Even council not make any
response, consider the permit is given and can start work.
Items of work that don't want permit to do work
Following small works are excluded from
resdential permit.
Adding or removing of windows or doors
Adding inter-communication doors
Adding or removing of partitions
White or color washing
Painting
Plastering and patchwork
Interior decoration without any structural
alterations.
Gardening excluding any permanent structures
Qualificaion of Designer.
Now you have doubt who can actually submit the
building plan in panjayath or municipality. The role of designer are advise the
owner regarding the feasibility of the project at preliminary stage, coordinate
the project, agent of owner to supervising the work, make specificaton,scedule
and drawing and work as arbitrator in the building project between the owner
and the contractor. The qualification and competence of designer are as follow
Supervisor. Qualification of a supervisor is
certificate diploma holder in architecture or engineering and 5 year’s
experience. A supervisor can submit the building permit application connected
with the building permit up to 300 sq.m and up to two storeys.
Architect. Qualification of architect is any
degree in architect. He can submit all pan and information connected with
building permit for one hectare area. He can also workout structural details
for building o plots up to 500sq.m and up to three storeys.
Engineer Qualification is civil engineering
degree. He can submit as mentioned above for an architect and structural work
of any building.